Following persistent opposition by locals towards South Western Railway’s (SWR) track-doubling in Velsao and Cansaulim, Rail Vikas Nigam Ltd (RVNL) on Monday decided to get back to the drawing board for a realignment of the additional line to save the structures along the proposed alignment.