Cabral: SC panel’s options for power lines not practical

Power minister Nilesh Cabral has not taken kindly to the recommendations made by the Supreme Court-appointed Central Empowered Committee (CEC) that the 440 KV high tension lines be drawn over the existing 220 kv alignment instead of opening new forest cover for the new power transmission lines.